Putting Our Stamp on TTR ~ Part I

One of the benefits for us of buying an HH55 catamaran is the opportunity to customize the boat to our liking.  No doubt that Morrelli and Melvin designed an incredible boat and HH is doing a fabulous job of fabricating that boat.  But we still have been able to add our own little stamp to the boat we will receive in a few months.

Beginning on the outside and forward at the bow, here are just a few items we have changed from “the norm” on previous HH55s.

Trampoline – The standard trampoline supplied by HYM is a 1 1/4 inch knotless dyneema material that is attached with individual lashings to the many, many attachment points on the hull. The 1 1/4 inch reference relates to the size of the hole between the strands of dyneema line. This dyneema trampoline is an excellent, lightweight choice for offshore and racing, the getting there part of sailing; however, for both the getting there and the being there part of sailing we chose an alternative. We wanted a trampoline comfortable for bare feet, dog paws, knees during yoga and relaxing at anchor.  Simply put, we wanted  to make the trampoline serve as both a useful and comfortable outdoor space.  Sunrise Yacht Products to the rescue! Richard worked beyond his duty to properly size and manufacture an offshore trampoline that would have all the benefits of dyneema with a host of other advantages. We settled on the Sunrise Offshore Polyester Open Net with 3/8″ net openings and attachment grommets to match each of the hull attachment points. We are super excited to play and work on this trampoline. By moving to this trampoline we did add 22 pounds to the overall weight of TTR.

 

Left represents the weave we chose for TTR. Right is a 1″ dyneema open weave.

Generator – Hudson Yacht has been installing a 12KW Fisher-Panda generator on the previous HH55’s and this was simply a deal breaker for Frank, my favorite mechanic. We have had different gensets on previous boats; however, the Northern Lights 9KW genset on Let It Be far surpassed any generator we have owned. The NL was quiet, easy to service, incredibly dependable, and NEVER failed to start. When we sold Let It Be, the genset had over 8,000 hours, ran beautifully, and the only part we had replaced was one alternator. Frank feels that the key to the NL genset success is that it has No, None, zero green circuit boards, only relays, and it runs at 1800 RPMs not the 3200-3600 RPMs seen with the Fisher-Panda. The NL genset is about 40 pounds heavier than the FP which makes zero difference to us. Our boat, for better or worse, will be electrically demanding and we accept the need for a generator; however, we absolutely wanted a machine on which we can depend.

Image 8-21-18 at 8.32 PM

A brand new Northern Lights Generator for TTR.

Bow Thruster – HH offers a bow thruster located in the starboard forepeak with a dropdown lower unit when the thruster is in use. All 3 of the previous HH55s have opted for the thruster; however, we chose to delete the thruster from TTR. Having the experience of Let It Be with no bow thruster and the fact that we expect to spend very little time coming to and from marina docks; we feel very comfortable with no bow thruster. The financial savings was big and eliminating the thruster saved us over 440 pounds!! However, we did build a monolithic patch in the forward hull allowing for easy installation of a bow thruster if desired in the future.

450 mm Extended longeron (bowsprit) – Since our sailing plans and reason for buying Ticket To Ride include a tropical circumnavigation, we realize that much of our sailing time will be spent with the wind aft of the beam. On Let It Be some of our favorite sailing days had the wind TWA at 130-170; however, we also found that to be a challenging wind direction for sail configuration. Alas, with Gino Morelli’s advice and working with our sailmaker, Matt Bridges, from Doyle NZ, we decided to extend the longeron / bowsprit by 450 mm and fly a large furled reacher from the very end of the bowsprit. This bring the headsail further forward into cleaner wind, less blanketed by the mainsail.

Image 8-16-18 at 8.52 PM

Longeron installed on TTR.

Cableless Reacher – The mainsail, genoa, and self tacking staysail on Ticket to Ride will be supplied by Doyle NZ (our choice) and will be very similar in size and cut to the previous HH55s.  The reacher/Code sail is where we have changed course from the previous HH55s. Again, since tropical circumnavigation is our plan we talked at length with anyone knowledgable about appropriate sail configurations for such plans. Matt Bridges from Doyle NZ is an excellent listener and his first proposal included a cableless reacher. “What is that animal?,” we asked. In brief, a cableless reacher eliminates the very thick torque rope around which a removable, furled headsail is normally wound when furled. Instead of the 3/4 inch torque rope tensioned to sometimes over 5 tons, the cableless reacher has additional spectra and carbon fibers built into the luff of the sail and is tensioned to about 1/8 of the torque rope specs. The trade off with a cableless reacher is that it will not go upwind as well as a torque rope and will never be a Code 0 or an A1. Rather the cut is more A2 or A3. WOW, that’s exactly what we want!

Cableless reacher #2

Cableless reacher production drawing from Doyle Sails.

Considering all the above features of the cableless reacher, we also did not order a gennaker at this time. We feel the cableless reacher will be much easier for us to handle alone and it provides 80% of the benefit of a gennaker. Eliminating the gennaker is a huge dollar, weight and storage savings.

Cableless reacher #1

Another view of the reacher drawing.

Spade Anchor and galvanized chain – Hudson Yacht’s standard spec for anchor and chain is a Stainless Lewmar Delta anchor and stainless chain manufactured in China. I don’t know about you, but, we say thank you to our anchor every morning when we wake up to find ourselves in the same spot as when we went to bed. Let It Be was delivered with a Lewmar Delta Anchor which worked fine in ideal conditions. Sailors know that ideal conditions are seldom found! After 3 weeks on Let It Be, much anchor research, and a boat show special, we chose to give Let It Be a new Spade Anchor and we never looked back. Grass, mud, sand, wind, or any combination of the above and we were always set. So why would we want to return to the past with Ticket To Ride? TTR will be sporting a beautiful stainless 1 piece Spade anchor. Concerning anchor chain, Practical Sailor says it best, “Steer Clear of Stainless-steel Mooring Chain.” Stainless chain, in addition to being inherently weaker, suffers from crevice corrosion leading to failure with no warning. We have spec’d 10 mm galvanized Acco chain for Ticket To Ride.

Stainless-Spade

Hopefully our anchor will never land in such a shallow spot!

Watermakers – We really did not vary too far from the HYM standard Spectra watermaker. What we did change is its location. Frank and I had a love/hate relationship with the huge storage capacity below the berths on Let It Be. On the love side it allowed us to carry ample spares, tools, and toys. On the hate side it seemed like every time we needed something different it was stored below a bed requiring the removal of bedsheets, mattresses, mattress support boards followed by digging.  The watermakers on HH5501 and HH5502 were installed below the master berth…. a much less than ideal location in our opinion!  Considering filter replacement, checking for leaks and the noise generated while making water, my maintenance specialist began an earnest search for a different location. After many emails, evaluation of drawings, and support questions to Spectra, the decision was made to put the Spectra 24v Newport 700 in a purpose built compartment in the port side forepeak. The HH crew is confident this will be an excellent long term home for the watermaker due to access for service, weight distribution and water spill cleanup. Only time will tell for this untested location.

It’s very fun to share the construction of a new boat with our friends and readers. The items above really only scratch the surface of the changes we have made to TTR to meet our needs. In a future blog post(s), we will share other custom changes to solar, electronics, seating, general arrangement, and so on.

In just a few days we are heading to China for the ‘soft launch’ of TTR and we look forward to seeing her in person! During soft launch, Ticket to Ride is placed in a pond so most of her systems can be tested. Soft launch allows HH to review all of the components of boat systems and it will give us our first chance to begin learning about the systems on TTR that will be new to us. (And I get to see how the interior colors I chose actually work together. Fingers crossed!)

Many, many thanks go to the HH crew, Gino Morelli and Mark Womble (Morelli and Melvin),  Matt Bridges (Doyle NZ), Paul Hakes, and at the top of the list is Let It Be. She was much more to us than a platform for learning but WOW we did learn a lot from Let It Be.

As always, thank you for stopping by our blog. We love hearing from you, so feel free to add your comments. And if you want to hear from us more often, check out our Facebook page.

 

One thought on “Putting Our Stamp on TTR ~ Part I

Leave a comment